We have upraded our BI ABAP system from 731 SPS7 to 740 SPS6. BI Cont upgraded from 747 SP4 to 757 SP1.
We skipped replication as per note 1649901 to save on downtime and now are executing it as detailed in the note as a post step for the source systems. Can you advise if this is fine i..e if you have done this. Basically i am gathering information for the next systems inline for upgrade.
Regards
Kalyan