Hi,
I am creating ticketing activities for STO using movement scenario 16, with reference to the nomination i have posted two ticket documents, it had created the STO delivery in the back ground and material document also got created with movement type 641, When i create the final ticket , the final delivery is also created with corresponding material document. At this point of time , system is creating another material document with movement type 552. In the stock overview for the plant all the stock is reverted back.
Any ide
Issue is resolved.
Message was edited by: Srinivas Josyula